1) Demolition (2–4 days)Typical cost: $1,500–$3,000
Typical timeframe: 2–4 days
This is when the old bathroom is removed: tile, fixtures, sometimes drywall and subfloor sections. In real life, demolition is also when “hidden issues” reveal themselves — like water damage behind the shower, soft subfloor, or framing that needs repairs. That’s why final scope (and final cost certainty) often comes after demo.
What can change the price here:
- unexpected damage behind walls
- extra layers of tile/mortar
- more disposal trips than planned